Daytime Noise Monitoring Results -- Normal weekday            
                         
Station M7a, Wah Ming House                    
Date Start Time End Time  Weather Noise level (dB(A)), 30 min Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
09-Dec-10 11:01 11:31 Sunny 69 71 65 Operation hand-held breakers N.A N.A 17.5 <5 ONO SOKKI  LA-5110  S/N: 72700154 ONO SOKKI  SC-2110  S/N: 00461
14-Dec-10 11:00 11:30 Foggy 71 73 67 Operation hand-held breakers
Rock excavation
Construction works in Wah Hong House N.A 21.8 <5 ONO SOKKI  LA-5110  S/N: 72700154 ONO SOKKI  SC-2110  S/N: 00461
22-Dec-10 13:24 13:54 Fine 63 64 59 Operation hand-held breakers
Rock excavation
N.A N.A 19.3 <5 ONO SOKKI  LA-5110  S/N: 72700154 ONO SOKKI  SC-2110  S/N: 00461
28-Dec-10 14:19 14:49 Fine 64 68 61 Maintenance work at the roof of Wah Ming House N.A N.A 15.4 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2656516
      Min. 63                
      Max. 71